Fastest Tension Safety Net Installations.

SafePassage Australia proposed to Alcoa Ltd at Pinjarra the installation of tension safetynets in their precipitation tanks faster using new equipment and changes to the process than their current contractor.

At that time a four-man team taking three shifts would install the safety nets.

Using new technologies, new approach, new equipment and the same team every time SafePassage Australia ended up exceeding Alcoa’s target – in fact achieving the net installs in five and a half hours, which was nearly one sixth of the time! Aloca were thrilled! SafePassage Australia were able to deliver safely and quickly every time - and faster than ever before reducing production downtime.